The engineer Rolando González, director of investments of the entity, also mention the beginning of the works for the assembly of eight generators, scheduled for the second stage as part of the local energy infrastructure, characterized by beautiful beaches.

In this environment connected by ground across a 27 kilometers highway that joins with Cayo Romano up to Jigüey Beach, different groups work, led by the Unit of Military Constructions, in the pursuit of creating conditions for the execution of hotel facilities and others.

According to the manager the first trimester of 2015 was dedicate to face the areas of low voltage, period in which 123 were eliminated, to restore areas of the public system of illumination with problems and to give answer to expositions of electorate, realized in the meetings of account capitulation with the delegates of the Peoples Power.

Everything without neglecting the elimination of five illegal power conections, three in the city of Camagüey, one in Minas and another one in the place known as El Polígono in the municipality of Nuevitas. This process goes today through resources difficulties, fundamentally of insulators and conductors.

They have not stopped the works of electrification of six rural establishments, lacking this service in the municipality of Minas; in Guáimaro (Los Gagos y los Barranco); way of La Torre in Florida; and in Carlos Manuel de Céspedes: San Pablo and Rabelo, according to the source.

For the present year, Camagüey kicked off with a program of 254 investments, which have grown up to 316 before new problems and with a total of 24 million pesos.

Translated by BA in English Language, Manuel Barrera Téllez

{flike} {plusone} {ttweet}